Generate project health insights including schedule variance, resource utilization, risk indicators, milestone tracking, and executive dashboard summaries
2 other projects use a version of this.
Adopted by
Most recently taken up by
- niyaznurbhasha/claude-skillstheir own version, first seen Apr 7, 2026
- vinci7/project-insights-skilltheir own version, first seen Oct 18, 2025
Other versions2 projects use a version of this.
Word for word · 0
None found.
Edited · 0
None found.
Wrote their own version · 2
- vinci7/project-insights-skill★ 1same name
- niyaznurbhasha/claude-skills★ 0same name
How matches are found. Word for word: the exact same text. Edited: shares passages with this file (“99% same” means 99% of its five-word phrases also appear here; 10% or more counts). Their own version: similar meaning, or, weakest, the same name. We can’t tell which project had it first. Projects are counted among the 200 most-starred candidates, and mentions are links to the repository we found, up to 50 per site, so both counts are a floor.
In this repository184 other files it gives its agents.
- happy-platform-skillsSkill
- application-scopeSkill
- batch-operationsSkill
- configuration-validationSkill
- deployment-workflowSkill
- generic-crud-operationsSkill
- instance-managementSkill
- schema-discoverySkill
- script-executionSkill
- script-syncSkill
- smart-assessmentSkill
- task-analysisSkill
- task-summarizationSkill
- update-set-managementSkill
- user-provisioningSkill
- workflow-creationSkill
- workspace-insightsSkill
- approval-summarizationSkill
- approval-workflowsSkill
- catalog-builder-aiSkill
- catalog-item-generationSkill
- item-creationSkill
- multi-turn-orderingSkill
- request-fulfillmentSkill
- ui-policiesSkill
- variable-managementSkill
- ci-discoverySkill
- cmdb-search-analysisSkill
- data-qualitySkill
- impact-analysisSkill
- relationship-mappingSkill
- service-graph-diagnosisSkill
- activity-responseSkill
- csm-case-summarizationSkill
- chat-recommendationSkill
- email-recommendationSkill
- csm-kb-generationSkill
- resolution-notesSkill
- csm-sentiment-analysisSkill
- csm-sidebar-summarizationSkill
- csm-suggested-stepsSkill
- trending-topicsSkill
- automated-testingSkill
- business-rulesSkill
- client-scriptsSkill
- code-assistSkill
- code-reviewSkill
- data-importSkill
- debugging-techniquesSkill
- fluent-sdkSkill
- glide-api-referenceSkill
- mcp-server-installationSkill
- mcp-serverSkill
- notificationsSkill
- performance-optimizationSkill
- scheduled-jobsSkill
- scripted-rest-apisSkill
- script-includesSkill
- servicenow-docs-mcpSkill
- test-generationSkill
- The first 60 shown.
The file
We split this skill into the rules it gives an agent
8 rules. About 0 are common, 2 are distinctive, and 6 are very specific to this project.
≈0
Common · estimate
Many files like this have a rule of this kind.
≈2
Distinctive · estimate
This author's own choices. Worth a look.
6
Very specific
Tied to their project's names, files or tools. Probably skip.
- Common
- Distinctive
- Very specific
- Distinctive: line 42
When to use: When project managers, PMO leaders, or executives need a data-driven assessment of project health, portfolio status, or sprint …
- Very specific: line 48
Access: Read access to pm_project, pm_project_task, planned_task, pm_resource_plan, rm_story, rm_sprint, risk tables
- Distinctive: line 66
If you only have the project number:
- Very specific: line 306
Use Display Values: Always include sysparm_display_value=true in REST calls for readable output in dashboards
- Very specific: line 307
Calculate Earned Value: Use percent_complete * budget_cost to derive earned value for EVM analysis
- Very specific: line 313
Validate Data Freshness: Check sys_updated_on timestamps to ensure metrics reflect current state
- Very specific: line 320
Solution: Check the project's percent_complete_method field.
- Very specific: line 325
Solution: Verify that time entries are being recorded against the project tasks.
≈ “Common” is an estimate: at least 1 in 5 of the 350,495 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.
Files
Project Insights
Overview
This skill enables you to generate comprehensive project health insights from ServiceNow's Strategic Portfolio Management (SPM) module. It covers:
- Analyzing schedule variance and timeline adherence across project tasks
- Measuring resource utilization against planned allocations
- Identifying risk indicators and potential blockers
- Tracking milestone completion and upcoming deadlines
- Calculating agile velocity and sprint burndown metrics
- Producing executive dashboard summaries with actionable recommendations
When to use: When project managers, PMO leaders, or executives need a data-driven assessment of project health, portfolio status, or sprint performance in ServiceNow SPM.
Prerequisites
- Plugins:
com.snc.project(Project Portfolio Management),com.snc.sdlc.agile.2.0(Agile Development 2.0) - Roles:
project_manager,program_manager,portfolio_manager, oradmin - Access: Read access to
pm_project,pm_project_task,planned_task,pm_resource_plan,rm_story,rm_sprint,risktables - Knowledge: Understanding of project scheduling concepts (critical path, EVM) and agile metrics (velocity, burndown)
Procedure
Step 1: Retrieve Project Overview
Fetch the core project record and its current status.
Using MCP (Claude Code/Desktop):
Tool: SN-Get-Record
Parameters:
table_name: pm_project
sys_id: [project_sys_id]
fields: sys_id,number,short_description,description,state,phase,priority,risk,percent_complete,start_date,end_date,actual_start_date,actual_end_date,work_start,work_end,schedule_variance,cost_variance,budget_cost,actual_cost,project_manager,program,portfolio,business_unit,health,health_reasonIf you only have the project number:
Using MCP:
Tool: SN-Query-Table
Parameters:
table_name: pm_project
query: number=PRJ0010001
fields: sys_id,number,short_description,state,phase,percent_complete,start_date,end_date,actual_start_date,schedule_variance,cost_variance,budget_cost,actual_cost,project_manager,health,risk
limit: 1Using REST API:
GET /api/now/table/pm_project?sysparm_query=number=PRJ0010001&sysparm_fields=sys_id,number,short_description,state,phase,percent_complete,start_date,end_date,actual_start_date,schedule_variance,cost_variance,budget_cost,actual_cost,project_manager,health,risk&sysparm_limit=1&sysparm_display_value=trueStep 2: Analyze Schedule Variance
Query project tasks to identify overdue, at-risk, and on-track items.
Using MCP:
Tool: SN-Query-Table
Parameters:
table_name: pm_project_task
query: parent=[project_sys_id]^stateNOT IN3,4,7^end_date<javascript:gs.nowDateTime()
fields: sys_id,number,short_description,state,percent_complete,start_date,end_date,actual_start_date,actual_end_date,assigned_to,priority,milestone
limit: 50Using REST API:
GET /api/now/table/pm_project_task?sysparm_query=parent=[project_sys_id]^stateNOT IN3,4,7^end_date<javascript:gs.nowDateTime()&sysparm_fields=sys_id,number,short_description,state,percent_complete,start_date,end_date,assigned_to,priority,milestone&sysparm_limit=50&sysparm_display_value=trueQuery upcoming tasks due within the next 14 days:
Using MCP:
Tool: SN-Query-Table
Parameters:
table_name: pm_project_task
query: parent=[project_sys_id]^stateNOT IN3,4,7^end_date>=javascript:gs.nowDateTime()^end_date<=javascript:gs.daysAgoEnd(-14)
fields: sys_id,number,short_description,state,percent_complete,end_date,assigned_to,priority,milestone
limit: 30Using REST API:
GET /api/now/table/pm_project_task?sysparm_query=parent=[project_sys_id]^stateNOT IN3,4,7^end_date>=javascript:gs.nowDateTime()^end_date<=javascript:gs.daysAgoEnd(-14)&sysparm_fields=sys_id,number,short_description,state,percent_complete,end_date,assigned_to,priority&sysparm_limit=30&sysparm_display_value=trueStep 3: Assess Resource Utilization
Query resource plans to understand allocation versus actual effort.
Using MCP:
Tool: SN-Query-Table
Parameters:
table_name: pm_resource_plan
query: task=[project_sys_id]^state=2
fields: sys_id,resource,planned_hours,actual_hours,remaining_hours,utilization,start_date,end_date,resource_type,group
limit: 50Using REST API:
GET /api/now/table/pm_resource_plan?sysparm_query=task=[project_sys_id]^state=2&sysparm_fields=sys_id,resource,planned_hours,actual_hours,remaining_hours,utilization,start_date,end_date,resource_type,group&sysparm_limit=50&sysparm_display_value=trueCalculate utilization metrics:
- Over-allocated: Resources where
actual_hours > planned_hours - Under-utilized: Resources where
utilization < 50% - At capacity: Resources where utilization is between 80% and 100%
Step 4: Review Risk Indicators
Query the risk table for project-specific risks and issues.
Using MCP:
Tool: SN-Query-Table
Parameters:
table_name: risk
query: task=[project_sys_id]^state!=6
fields: sys_id,number,short_description,category,risk_score,probability,impact,state,response,assigned_to,due_date,mitigation_plan
limit: 20Using REST API:
GET /api/now/table/risk?sysparm_query=task=[project_sys_id]^state!=6&sysparm_fields=sys_id,number,short_description,category,risk_score,probability,impact,state,response,assigned_to,due_date,mitigation_plan&sysparm_limit=20&sysparm_display_value=trueStep 5: Track Milestones
Query milestone tasks to assess progress against key deliverables.
Using MCP:
Tool: SN-Query-Table
Parameters:
table_name: pm_project_task
query: parent=[project_sys_id]^milestone=true^ORDERBYend_date
fields: sys_id,number,short_description,state,percent_complete,end_date,actual_end_date,assigned_to,priority
limit: 20Using REST API:
GET /api/now/table/pm_project_task?sysparm_query=parent=[project_sys_id]^milestone=true^ORDERBYend_date&sysparm_fields=sys_id,number,short_description,state,percent_complete,end_date,actual_end_date,assigned_to,priority&sysparm_limit=20&sysparm_display_value=trueStep 6: Gather Agile Metrics (If Applicable)
For projects using Agile methodology, query sprint and story data.
Using MCP:
Tool: SN-Query-Table
Parameters:
table_name: rm_sprint
query: release.product.project=[project_sys_id]^state=3^ORDERBYDESCend_date
fields: sys_id,number,short_description,start_date,end_date,story_points,capacity,state
limit: 5Query completed stories per sprint to calculate velocity:
Using MCP:
Tool: SN-Query-Table
Parameters:
table_name: rm_story
query: sprint=[sprint_sys_id]^state=3
fields: sys_id,number,story_points,state,sprint
limit: 100Using REST API:
GET /api/now/table/rm_story?sysparm_query=sprint=[sprint_sys_id]^state=3&sysparm_fields=sys_id,number,story_points,state&sysparm_limit=100Calculate velocity: Sum of story_points for completed stories in each sprint. Average the last 3-5 sprints for a reliable velocity metric.
Step 7: Compile the Executive Dashboard Summary
Assemble all collected data into a structured health report:
=== PROJECT HEALTH DASHBOARD ===
Project: PRJ0010001 - Cloud Migration Phase 2
Manager: Sarah Chen | Program: Digital Transformation
Phase: Execution | Health: [Green/Yellow/Red]
SCHEDULE PERFORMANCE:
Planned End: 2026-06-30 | Projected End: 2026-07-15
Schedule Variance: +15 days (at risk)
Tasks Overdue: 4 of 32 (12.5%)
Tasks Due Next 14 Days: 7
Milestones Completed: 3 of 8 (37.5%)
Next Milestone: "Integration Testing Complete" due 2026-04-01
COST PERFORMANCE:
Budget: $450,000 | Actual Spend: $285,000 (63.3%)
Cost Variance: -$12,000 (under budget)
Burn Rate: $47,500/month
Projected Total: $427,500
RESOURCE UTILIZATION:
Total Resources: 12
Over-allocated (>100%): 2 (John D. 120%, Maria S. 115%)
Under-utilized (<50%): 1 (Alex K. 35%)
Average Utilization: 82%
RISK SUMMARY:
Open Risks: 5 (2 High, 2 Medium, 1 Low)
Top Risk: "Vendor API deprecation" (Score: 16, Impact: High)
Overdue Mitigations: 1
AGILE VELOCITY (Last 3 Sprints):
Sprint 14: 34 pts | Sprint 15: 38 pts | Sprint 16: 31 pts
Average Velocity: 34.3 pts/sprint
Remaining Backlog: 142 pts
Projected Sprints to Complete: 4.1 sprints
RECOMMENDATIONS:
1. [URGENT] Address 4 overdue tasks blocking Integration Testing milestone
2. [ACTION] Rebalance workload from John D. and Maria S. to Alex K.
3. [MONITOR] Vendor API deprecation risk - mitigation plan overdue
4. [PLAN] At current velocity, backlog completion extends 1 sprint beyond planStep 8: Portfolio-Level Insights
For PMO leaders, aggregate project health across the portfolio.
Using MCP:
Tool: SN-Query-Table
Parameters:
table_name: pm_project
query: portfolio=[portfolio_sys_id]^stateNOT IN-5,3,4
fields: sys_id,number,short_description,state,phase,health,percent_complete,schedule_variance,cost_variance,budget_cost,actual_cost,risk,project_manager,end_date
limit: 50Using REST API:
GET /api/now/table/pm_project?sysparm_query=portfolio=[portfolio_sys_id]^stateNOT IN-5,3,4&sysparm_fields=sys_id,number,short_description,state,phase,health,percent_complete,schedule_variance,cost_variance,budget_cost,actual_cost,risk,project_manager,end_date&sysparm_limit=50&sysparm_display_value=trueTool Usage
MCP Tools Reference
| Tool | When to Use |
SN-Get-Record | Retrieve a single project or task record by sys_id |
SN-Query-Table | Query bounded task, resource, risk, milestone, sprint, and story fields; calculate summaries locally |
SN-Natural-Language-Search | Natural language search for projects (e.g., "find at-risk projects in Q2") |
REST API Reference
| Endpoint | Method | Purpose |
/api/now/table/pm_project | GET | Query project records and portfolio data |
/api/now/table/pm_project_task | GET | Query tasks, milestones, schedule data |
/api/now/table/pm_resource_plan | GET | Resource allocation and utilization |
/api/now/table/risk | GET | Project risks and mitigations |
/api/now/table/rm_sprint | GET | Sprint data for velocity calculations |
/api/now/table/rm_story | GET | Story completion for burndown metrics |
/api/now/table/pm_portfolio | GET | Portfolio-level aggregation |
/api/now/table/pm_program | GET | Program-level project grouping |
Best Practices
- Use Display Values: Always include
sysparm_display_value=truein REST calls for readable output in dashboards - Calculate Earned Value: Use
percent_complete * budget_costto derive earned value for EVM analysis - Trend Over Time: Compare metrics across multiple reporting periods to identify trends, not just snapshots
- Focus on Leading Indicators: Prioritize velocity trends, upcoming milestones, and resource constraints over lagging metrics
- Set Health Thresholds: Define clear Green/Yellow/Red criteria (e.g., Green = schedule variance < 5 days, Yellow = 5-15 days, Red = >15 days)
- Include Recommendations: Raw data is insufficient; always provide actionable recommendations with urgency levels
- Cross-Reference Risks: Correlate overdue tasks with open risks to identify systemic issues
- Validate Data Freshness: Check
sys_updated_ontimestamps to ensure metrics reflect current state
Troubleshooting
"Project shows 0% complete despite finished tasks"
Cause: Percent complete may be calculated from planned duration, not task completion
Solution: Check the project's percent_complete_method field. Options include "manual," "task-based," and "duration-based." Verify task states are correctly updated.
"Resource utilization numbers seem incorrect"
Cause: Resource plan records may not have actuals logged
Solution: Verify that time entries are being recorded against the project tasks. Check actual_hours on pm_resource_plan records.
"No risk records found for the project"
Cause: Risks may be linked via the task field to project tasks rather than the project itself
Solution: Query with task.parent=[project_sys_id] to find risks linked to child tasks. Also check risk_condition for auto-generated risk records.
"Sprint velocity data is inconsistent"
Cause: Stories may be moved between sprints or completed after sprint closure
Solution: Filter for stories where sprint matches the target sprint and state=3 (Complete). Exclude stories moved out via sprint_changed field if available.
Examples
Example 1: Weekly Status Report for a Single Project
Step 1 - Gather data:
Tool: SN-Query-Table
Parameters:
table_name: pm_project
query: number=PRJ0010042
fields: sys_id,number,short_description,state,phase,health,percent_complete,schedule_variance,budget_cost,actual_cost,project_manager,end_date
limit: 1Step 2 - Get overdue tasks:
Tool: SN-Query-Table
Parameters:
table_name: pm_project_task
query: parent=[sys_id]^state=2^end_date<javascript:gs.nowDateTime()
fields: number,short_description,end_date,assigned_to,priority
limit: 10Output:
WEEKLY STATUS - PRJ0010042 ERP Upgrade
Report Date: 2026-03-19
Health: YELLOW | Phase: Testing | Complete: 72%
Schedule: 8 days behind plan | Budget: $12K under budget
KEY ISSUES:
- 3 overdue tasks in Integration Testing phase
- UAT environment provisioning delayed by vendor
MILESTONES:
[DONE] Requirements Complete (Feb 15)
[DONE] Development Complete (Mar 01)
[LATE] Integration Testing (Due Mar 10, now projected Mar 22)
[UPCOMING] UAT Sign-off (Due Apr 05)
[UPCOMING] Go-Live (Due Apr 30)
ACTIONS NEEDED:
1. Escalate vendor environment issue to procurement
2. Add 2 QA resources for parallel testingExample 2: Portfolio Health Summary
Tool: SN-Query-Table
Parameters:
table_name: pm_project
query: portfolio.short_description=Digital Transformation^stateNOT IN-5,3,4
fields: number,short_description,health,percent_complete,schedule_variance,budget_cost,actual_cost,end_date,project_manager
limit: 20Output:
PORTFOLIO DASHBOARD - Digital Transformation
Active Projects: 8 | Total Budget: $3.2M
HEALTH DISTRIBUTION:
Green: 5 projects (62.5%)
Yellow: 2 projects (25.0%)
Red: 1 project (12.5%)
AT-RISK PROJECTS:
[RED] PRJ0010042 - ERP Upgrade (8 days behind, vendor dependency)
[YELLOW] PRJ0010055 - API Gateway (resource constraints)
[YELLOW] PRJ0010061 - Data Lake (scope change pending approval)
BUDGET SUMMARY:
Allocated: $3,200,000
Spent: $1,890,000 (59.1%)
Projected: $3,050,000 (4.7% under budget)Related Skills
spm/agile-story-generation- Generate and manage user storiesspm/planning-summarization- Summarize planning sessions and portfolio decisionsspm/feedback-summarization- Analyze retrospective and stakeholder feedbackreporting/executive-dashboard- Build executive dashboards and visualizationsreporting/trend-analysis- Trend analysis for project metrics over time
Does it work?
Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.
No reviews yet
People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.
- It worked
- Partly
- It didn't
Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.
Your trail
Files you open will collect here, so you can find them again.
Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.
Now do this for your own.
Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.