calendar-planner
Skill0 starsChanged 7 months agoApache-2.0View on GitHub
Build resource-realistic 90-day content calendars grounded in configured pillars, real team constraints, live calendar data, and audience performance patterns. Never plan more than the team can execute. A 90-day calendar that fails at week three is worse than a 60-day calendar that holds. Used by /calendar.
In this repository4 other files it gives its agents.
- client-contextSkill
- competitive-intelSkill
- content-strategistSkill
- editorial-configSkill
The file
Show its rules and text
We split this skill into the rules it gives an agent
13 rules. About 0 are common, 13 are distinctive, and 0 are very specific to this project.
≈0
Common · estimate
Many files like this have a rule of this kind.
≈13
Distinctive · estimate
This author's own choices. Worth a look.
0
Very specific
Tied to their project's names, files or tools. Probably skip.
- Common
- Distinctive
- Very specific
- Distinctive: line 12
Run this before building any calendar.
- Distinctive: line 38
Use these only when exact capacity isn't documented.
- Distinctive: line 68
Check before building any week:
- Distinctive: line 87
Use these as starting points only — verify against the client's actual industry:
- Distinctive: line 132
If the balance is off from default, explain why in one line.
- Distinctive: line 138
Every configured audience segment must be served at least once per month.
- Distinctive: line 148
After building the calendar, verify:
- Distinctive: line 211
Every calendar needs a buffer.
- Distinctive: line 235
Not heavily time-stamped (no "in 2024" in the headline)
- Distinctive: line 241
If performance data exists and is recent (< 30 days from ~~email or ~~docs), use it to weight format and topic decisions.
- Distinctive: line 261
Run the resource reality test before building — show the math
- Distinctive: line 262
Check seasonal holds before placing any content
- Distinctive: line 276
Use generic seasonal moments that don't apply to the client's industry
≈ “Common” is an estimate: at least 1 in 5 of the 350,495 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.
Files
Calendar Planner
Build plans the team can actually execute. A 90-day calendar that fails at week three is worse than a 60-day calendar that holds. Every calendar decision starts with capacity, not ambition.
The Resource Reality Test
Run this before building any calendar. No exceptions. This is the single most important step — it prevents the #1 failure mode of content calendars: planning more than the team can produce.
Capacity Calculation
Team: {team size or description}
Cadence: {publishing cadence}
90-day total capacity: [{pieces/week} × 12 weeks = {N total pieces}]
Seasonal holds: [{N} weeks blocked]
Available weeks: [12 - holds = {N}]
Effective capacity: [{pieces/week} × {available weeks} = {N}]Capacity Rules
| Capacity Utilization | Status | Action |
| < 70% of capacity | Under-planned | Consider adding content types, formats, or channels |
| 70-85% | Healthy | Optimal — leaves room for quality and contingency |
| 85-90% | Tight | Flag to the user — any disruption breaks the plan |
| > 90% | Over-planned | Cut scope before presenting. State what was cut and why. |
State the capacity ceiling explicitly in the output. Clients need to see the math. A calendar that shows "12 pieces planned / 15 capacity = 80%" gives the user confidence. A calendar that just lists dates without capacity context creates silent anxiety about whether they can keep up.
Team Capacity Benchmarks
Use these only when exact capacity isn't documented. Always verify with the user.
| Team Size | Typical Weekly Capacity | Notes |
| Solo creator | 1-2 pieces/week | No parallel production. One sick day = missed week. |
| Creator + part-time editor | 2-3 pieces/week | Can do light parallel production (draft + edit) |
| 2-3 person content team | 3-5 pieces/week | Parallel production possible. Can sustain two channels. |
| 4-6 person team | 5-10 pieces/week | Can sustain 3+ channels with dedicated owners |
| Full content organization | 10+ pieces/week | Multiple channels, specialized roles, production workflows |
Production Timeline Benchmarks
Factor these into calendar scheduling — content needs lead time.
| Content Type | Production Time | Team Size Adjustment |
| Blog post (800-1500 words) | 3-5 business days | Solo: add 1-2 days |
| Long-form guide (2000+ words) | 5-8 business days | Solo: add 3-5 days |
| Newsletter issue | 2-3 business days | Solo: add 1 day |
| Email sequence (3-5 emails) | 4-6 business days | Solo: add 2-3 days |
| Social media pack (5 posts) | 1-2 business days | Solo: same |
| Case study | 5-10 business days (includes interview) | Solo: add 3-5 days |
| Landing page copy | 3-5 business days | Solo: add 2 days |
| Video script | 2-3 business days (script only) | Production adds 1-3 weeks |
| Infographic | 3-5 business days (includes design) | Solo with no design: add Canva time or cut |
Seasonal Planning
Seasonal Lock-In
Check before building any week:
- Hard holds — absolute blackout periods. Nothing goes there. (From ~~docs or user input)
- Calendar events — if ~~calendar is connected, pull upcoming events, launches, campaigns
- Industry seasonality — relevant seasonal moments for this industry
- Client seasonality — the client's own seasonal patterns (busy season, slow season, event season)
Seasonal Moment Rules
| Rule | Why |
| Seasonal moments drive editorial angles — they don't invent content | "Valentine's Day" is not a pillar. "Gift guide for [your audience]" is a seasonal angle on an existing pillar. |
| Every seasonal hook must connect to a configured pillar | If a seasonal moment doesn't fit any pillar, skip it |
| Don't plan around seasonal moments irrelevant to the client's industry | A B2B SaaS company doesn't need a "summer reading list" unless it connects to their audience |
| Plan seasonal content 2-4 weeks ahead of the moment | Publishing on Valentine's Day is too late — the gift guide should go live January 25 |
| Mark tentpole moments early in the calendar | These are anchor points — build surrounding content around them |
Common Seasonal Patterns by Industry
Use these as starting points only — verify against the client's actual industry:
| Industry | Seasonal Peaks | Content Implications |
| Travel/Hospitality | Spring (planning), Summer (travel), Holiday (gifting) | Lead content by 4-6 weeks; shoulder season is underserved |
| B2B SaaS | Q1 (budget season), Q4 (renewal/planning) | Budget justification content in Q4; new year goal content in Q1 |
| E-commerce | Black Friday/Holiday, Back to School, Valentine's | Gift guides, deals content, seasonal buying guides |
| Education | Back to school, enrollment periods, academic year | Align to academic calendar; summer is quiet |
| Finance | Tax season, year-end, quarterly reporting | Timely regulatory and planning content |
| Health/Wellness | New Year, Spring, Back to School | Resolution content, seasonal wellness, routine shifts |
Pillar Rotation Logic
A healthy 90-day calendar rotates across all pillars — no pillar dominates every week, no pillar disappears for a month.
Default Rotation
| Number of Pillars | Distribution | Notes |
| 2 pillars | 50% / 50% | Alternate weeks |
| 3 pillars | 33% / 33% / 34% | Rotate across weeks |
| 4 pillars | 25% each | Each pillar appears at least once per month |
| 5+ pillars | Equal distribution, grouped | Consider combining thin pillars |
Rotation Adjustments
| Pillar Status | Weight Adjustment | Rationale |
| Thin | Increase to max 40% for 30-60 days | Build the pillar with concentrated investment |
| Healthy | Maintain at default weight | Sustain the position without over-investing |
| Over-saturated | Reduce to min 15% | Prevent content fatigue; audience needs variety |
| Untested | Test at 20-25% for 30 days, then reassess | Gather data before committing |
Pillar Balance Visualization
Show this in every calendar output:
PILLAR BALANCE (90 days)
[Pillar A]: ████████████ 35% (target: 33%) — Building (Thin pillar)
[Pillar B]: ██████████ 30% (target: 33%) — On track
[Pillar C]: ██████████ 30% (target: 34%) — On track
[Pillar D]: █████ 5% — Seasonal onlyIf the balance is off from default, explain why in one line.
Segment Coverage
Monthly Coverage Requirements
Every configured audience segment must be served at least once per month. Not every piece — but every segment gets at least one primary piece per month.
| Segment Priority | Monthly Minimum | Rationale |
| Primary segment | 2-3 pieces directly addressing their needs | This is your core audience |
| Secondary segment | 1-2 pieces | Growing audience or strategic audience |
| Emerging segment | 1 piece | Testing whether this audience responds |
Segment Coverage Check
After building the calendar, verify:
- Every segment is served at least once per month
- Underserved segments (from /audit) are prioritized in Month 1
- No segment goes more than 2 weeks without primary content
- High-value segments get the highest-quality content formats
Repurposing Chains
A well-built repurposing chain doubles effective output without doubling effort. Build chains into the plan explicitly — don't leave repurposing as an afterthought.
Standard Repurposing Chains
| Chain | Source → Derivative | Time Savings vs. Creating Separately |
| Basic | Blog post → Newsletter excerpt → Social post | ~3-4 hours |
| Extended | Blog post → Newsletter excerpt → Social post → Email teaser → Pull quote graphic | ~6-8 hours |
| Video | Webinar/Video → Blog recap → Social clips → Email highlights | ~8-12 hours |
| Research | Survey/Report → Blog series (3-5 posts) → Infographic → Social series → Email nurture | ~15-20 hours |
| Event | Conference talk → Blog post → LinkedIn article → Twitter thread → Newsletter feature | ~8-10 hours |
Repurposing Rules
| Rule | Why |
| Every long-form piece gets at least a Basic chain | Minimum viable repurposing — no content should exist in only one format |
| Repurposed content must be platform-native | A blog post excerpt ≠ a LinkedIn post. Rewrite for the platform. |
| Schedule derivatives within 3-7 days of the source | Freshness matters — don't repurpose a January blog in March |
| Show time savings in the calendar output | The user needs to see the efficiency argument, not just the volume |
| Don't count repurposed content toward capacity | It's derived, not original — capacity counts original pieces only |
Repurposing Efficiency Summary
Show this in every calendar output:
REPURPOSING EFFICIENCY
Original pieces: {N}
Derived pieces: {N} (from {N} repurposing chains)
Time saved: ~{N} hours vs. creating each piece separately
Effective output: {N} total pieces from {N} originalsMonthly Theme Logic
Each month needs a theme — specific, evocative, grounded in the client's voice. Not generic editorial labels.
Theme Quality Criteria
| Good Theme | Bad Theme | Why |
| "The Operator's Advantage" | "Building Awareness" | Good: specific, evocative, could be a section title. Bad: generic marketing label. |
| "Why {Destination} in Shoulder Season" | "Spring Content" | Good: audience-relevant, specific. Bad: internal planning term. |
| "The Stack Nobody Talks About" | "Technology Month" | Good: curiosity-driven, positions a pillar. Bad: category label. |
Theme Selection Process
- Which pillar is the primary focus for this month? (From rotation logic)
- Is there a seasonal moment that creates a natural hook?
- What's the strongest angle within this pillar that serves the primary segment?
- Can the theme be expressed in language the audience would recognize and find interesting?
Contingency Planning
Every calendar needs a buffer. Things fall through — interviews cancel, drafts miss deadlines, breaking news changes priorities. Plan for it.
Buffer Week
Mark one week per month as flex — content is planned but not committed. This is your pressure relief valve.
| Month | Flex Week | Planned Content | Fallback |
| Month 1 | Week 4 | [{Planned piece}] | Evergreen standby #1 |
| Month 2 | Week 8 | [{Planned piece}] | Evergreen standby #2 |
| Month 3 | Week 12 | [{Planned piece}] | Refresh of a top performer |
Evergreen Standbys
Identify 2-3 evergreen pieces from content history that can republish or refresh if a planned piece falls through.
Good evergreen standbys:
- Top-performing pieces that are 3+ months old (refresh with current data)
- Foundational explainers that don't go stale
- Best-of compilations or round-ups that can be quickly updated
- FAQ or how-to content with perennial relevance
Selection criteria:
- Previously performed well (top quartile by engagement)
- Not heavily time-stamped (no "in 2024" in the headline)
- Can be refreshed in < 2 hours
- Serves a high-priority segment
Performance Weighting
If performance data exists and is recent (< 30 days from ~~email or ~~docs), use it to weight format and topic decisions.
Weighting Rules
| Signal | Calendar Action |
| Format consistently outperforms others | Weight recommendations toward that format |
| A specific pillar consistently underperforms | Investigate — angle problem? format problem? audience mismatch? |
| A topic drove unusual engagement | Plan a follow-up or series |
| A content type consistently underperforms | Flag it — recommend testing alternatives or cutting |
| Open rates are declining over time | Recommend subject line testing and list hygiene |
When No Performance Data Exists
- Weight toward the client's most-used content format (from content history)
- Note that recommendations are based on content patterns, not engagement data
- Recommend establishing baseline tracking as a 30-day action
Always Do
- Run the resource reality test before building — show the math
- Check seasonal holds before placing any content
- Show pillar balance percentages across the full 90 days
- Build repurposing chains with explicit time savings
- Mark one week per month as flex/buffer
- Identify evergreen standbys from content history
- Serve every configured segment at least once per month
- Include production lead time in scheduling
- Show capacity utilization as a percentage
Never Do
- Plan content into blackout periods
- Build a calendar that exceeds 90% of publishing capacity without flagging it
- Recommend channels the client doesn't use
- Use generic seasonal moments that don't apply to the client's industry
- Let one pillar dominate the full 90 days without acknowledging the imbalance
- Plan without a contingency — something always falls through
- Present a calendar without the capacity math
- Assume repurposing takes zero time — it takes less time, not no time
- Schedule derived content more than 7 days after the source piece
Cross-Skill Dependencies
- Receives from: editorial-config (all constraints, pillar statuses, history, calendar data, performance)
- Receives from: content-strategist (priority recommendations — P1s drive Month 1 planning)
- Used by: /calendar command
- Informs: /draft (calendar-planned pieces feed into content drafting)
Does it work?
Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.
No reviews yet
People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.
- It worked
- Partly
- It didn't
Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.
Your trail
Files you open will collect here, so you can find them again.
Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.
Now do this for your own.
Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.