project-blueprint
Skill0 starsChanged 2 months agoMITView on GitHub
Acts as software architect to define a software system from scratch BEFORE writing code. Turns a raw idea into a validated, code-ready blueprint — refining the idea, writing the spec/PRD, choosing the architecture, setting the security, quality and testing baseline, and writing the plan and agent handoff files into the repo. Use when starting a new project, feature, or system, when the user says "design/plan/define/architect X", "empezar un proyecto", "definir el sistema antes de codear", or wants a PRD, architecture, technical plan, ADR, or threat model.
5 other projects use a version of this.
Adopted by
Most recently taken up by
- Kin9Zeus/senior-engineer-skillstheir own version, first seen Nov 1, 2026
- bfernandois059/dev-workflow-skillstheir own version, first seen Oct 20, 2026
- ItzMeet2/project_blueprint_skilltheir own version, first seen Oct 15, 2026
- shuguang1994/project-blueprinttheir own version, first seen Sep 18, 2026
- zzhqqa478850-lang/project-blueprint-agenttheir own version, first seen May 25, 2026
Other versions5 projects use a version of this.
Word for word · 0
None found.
Edited · 0
None found.
Wrote their own version · 5
- shuguang1994/project-blueprint★ 23same name
- Kin9Zeus/senior-engineer-skills★ 3same name
- zzhqqa478850-lang/project-blueprint-agent★ 2same name
- bfernandois059/dev-workflow-skills★ 1same name
- ItzMeet2/project_blueprint_skill★ 1same name
How matches are found. Word for word: the exact same text. Edited: shares passages with this file (“99% same” means 99% of its five-word phrases also appear here; 10% or more counts). Their own version: similar meaning, or, weakest, the same name. We can’t tell which project had it first. Projects are counted among the 200 most-starred candidates, and mentions are links to the repository we found, up to 50 per site, so both counts are a floor.
The file
Show its rules and text
We split this skill into the rules it gives an agent
19 rules. 0 are common, 13 are distinctive, and 6 are very specific to this project.
0
Common
Most of the 4 edited versions we read keep these.
13
Distinctive
This author's own choices. Worth a look.
6
Very specific
Tied to their project's names, files or tools. Probably skip.
- Common
- Distinctive
- Very specific
- Distinctive: line 24
Do not use it for: a one-line bug fix, a mechanical refactor, or a change with an obvious, already-agreed design.
- Distinctive: line 29
Understand before you build: Never design a solution until the problem, users, and success criteria are clear.
- Distinctive: line 31
One question at a time: When clarifying, ask a single, preferably multiple-choice question — never a wall of questions.
- Distinctive: line 35
Decide explicitly, record decisions: Every one-way door becomes an ADR with alternatives and trade-offs.
- Distinctive: line 40
Everything is a trade-off: If a decision looks free, you haven't found its cost yet.
- Distinctive: line 42
No completion claim without evidence: Before saying a gate passed or a check ran, run the check and read the output.
- Distinctive: line 48
Do not run the full ceremony on a small change — that's the number-one reason people abandon a process.
- Distinctive: line 85
Make sure there *is* a clear, agreed problem before designing anything.
- Distinctive: line 87
Read any existing context first (repo, docs, prior notes) before asking anything.
- Very specific: line 90
If the idea is still raw or contested, run the idea-refinement loop in references/phase-1-discovery.md: clarify one question at a time, …
- Very specific: line 106
Read references/phase-1-discovery.md.
- Very specific: line 126
Read references/phase-2-architecture.md (plus tech-selection.md for concrete technologies, build-vs-buy and cost.
- Distinctive: line 130
Write a six-part quality scenario for every high-importance, high-difficulty leaf of the utility tree.
- Distinctive: line 143
Call out what NOT to build yet — premature scope is the number-one architecture mistake.
- Very specific: line 154
Read references/security.md, references/quality-reliability.md and
- Very specific: line 181
Read references/phase-4-planning.md and references/templates.md.
- Distinctive: line 187
Every task carries all seven fields, including a runnable Verify command.
- Very specific: line 192
Gate 4 — proceed only when: every task is small, ordered, traceable to an FR-n or ADR, and carries a Verify command.
- Distinctive: line 199
Write the artifacts to the repo so a fresh session — human or agent — can start work with no re-explanation.
“Common” is measured: kept by at least 6 in 10 of the 4 edited versions of this file we could read. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.
Files
Project Blueprint — From Idea to Code-Ready Design
You are acting as a software architect + product engineer. Take a fuzzy idea and produce a validated blueprint that a team — or a coding agent — can implement with confidence. Never jump to code before the system is defined.
When to use
- Starting a new project, product, feature, or subsystem from zero.
- The user asks to design, architect, plan, scope, or spec something before coding.
- Someone hands you a vague idea ("I want an app that…") and expects a real plan.
- You need a PRD, architecture decision, data model, API contract, threat model, or technical plan.
Do not use it for: a one-line bug fix, a mechanical refactor, or a change with an obvious, already-agreed design. For those, just do the work.
Golden rules (apply throughout)
- Understand before you build. Never design a solution until the problem, users, and success criteria are clear.
- One question at a time. When clarifying, ask a single, preferably multiple-choice question — never a wall of questions.
- YAGNI ruthlessly. Build only what the current requirements demand. Prefer the simplest thing that works. Rule of Three before abstracting.
- Decide explicitly, record decisions. Every one-way door becomes an ADR with alternatives and trade-offs. Two-way doors get decided fast and locally, without ceremony.
- Security and testability are design inputs, not afterthoughts. Threat-model before you pick controls.
- Validate incrementally. Present the design in small sections and confirm each before moving on.
- State assumptions and non-goals. What you are not building is as important as what you are.
- Everything is a trade-off. If a decision looks free, you haven't found its cost yet. Say what you are trading away, every time.
- No completion claim without evidence. Before saying a gate passed or a check ran, run the check and read the output. Never write "should work" as a status.
- Write it down, in the repo. A blueprint that exists only in the conversation is not a deliverable.
Scale the process to the project size
Do not run the full ceremony on a small change — that's the number-one reason people abandon a process. Pick a mode first, then run only what it calls for. When unsure, ask which mode fits, or infer from scope.
| Mode | Use for | What to run |
| Lite | A single feature, a small tool, a spike or prototype, or a change with a mostly-known design | Phase 0 framing (a few questions) → a short spec (problem + a handful of FR-n + non-goals) → name the 2–3 architecture, security and testing decisions that matter → a task list with Verify commands + Definition of Done → AGENTS.md. Skip the full PRD; use a one-line Y-statement instead of ADRs unless a decision is irreversible. One page total. |
| Standard ⭐ default | A new app, service, or substantial feature set | All 6 phases, each artifact kept tight. Full PRD, architecture with 1–3 ADRs, threat model, testing strategy per component, ordered task plan, artifacts written to docs/. |
| Full | A system handling money, personal data or regulated data; multiple teams; high scale or availability targets | Standard + scored quality gates and human checkpoints, cross-cutting concerns (cross-cutting.md), diagrams (diagrams.md), fitness functions, deeper reliability and DR, a project constitution, and explicit build-vs-buy plus cost analysis (tech-selection.md). |
Whatever the mode: the golden rules always apply, and money, personal data and auth code are always treated as HIGH criticality — even inside a Lite project.
The ceremony scales with the task. The approval gate never does: do not start implementing until you have said what you intend to do and the user has agreed. When torn between two modes, take the heavier one; discovering hidden complexity mid-task upgrades the mode, and nothing downgrades it mid-task.
The pipeline (6 phases, each with an exit gate)
Work through the phases in order. Each has a gate — do not advance until it passes. Loop back freely when new information invalidates an earlier decision.
0. FRAME → 1. DISCOVER → 2. ARCHITECT → 3. HARDEN → 4. PLAN → 5. HANDOFF → (code)
problem spec/PRD structure security/ ordered files in
clear? + FR-n + data + API quality/test tasks+DoD the repoLoad the matching reference when you enter each phase. SKILL.md is the map; the references hold the checklists and templates.
See it applied:
references/example-walkthrough.mdruns a real app (SplitWise-lite, a bill-splitting tool) through every phase with filled-in artifacts.
Phase 0 — FRAME the problem
Make sure there is a clear, agreed problem before designing anything.
- Read any existing context first (repo, docs, prior notes) before asking anything.
- Confirm: What problem? For whom? Why now? What does success look like?
- Set the appetite — how much this problem is worth in time — before shaping any solution.
- If the idea is still raw or contested, run the idea-refinement loop in
references/phase-1-discovery.md: clarify one question at a time, then explore about 6 approaches (3 safe, 3 divergent, always including a "smallest thing that could work" and, where relevant, a "buy instead of build"), each with its appetite and rabbit holes, leading with your recommendation. - Kill or park ideas here when they deserve it. Killing an idea with a documented reason is a successful outcome, not a failure.
Gate 0 — proceed only when: the problem statement, target users, appetite and a rough notion of success are written down and the user agrees.
Phase 1 — DISCOVER: write the spec / PRD
A testable specification of what to build, not how.
Read references/phase-1-discovery.md. Produce a spec/PRD with: Overview (problem, solution summary,
users, appetite) · Goals, Success Metrics (baseline/target/timeline) and counter-metrics ·
Non-Goals · User Stories (P0/P1/P2, each with why-this-priority and an independent test) · Scope
(in/out/future) plus pre-decided rabbit holes · Functional Requirements (FR-n, atomic and testable,
with Given/When/Then or EARS acceptance criteria) · Technical Considerations (constraints only) ·
Dependencies & Risks (seeded by a pre-mortem) · Open Questions · Glossary · Assumptions Index.
Then run the clarify gate: scan the eleven coverage categories, ask at most five ranked questions one at a time, and write each answer back into the spec immediately. Anything left over becomes an explicit assumption with an owner, or it blocks.
Gate 1 — proceed only when the spec quality checklist passes. Report it as a score, for example "14/16 passing", and fix the failures before advancing.
Phase 2 — ARCHITECT: design the system
Choose the structure and define boundaries, data, and contracts.
Read references/phase-2-architecture.md (plus tech-selection.md for concrete technologies,
build-vs-buy and cost; diagrams.md for diagrams). Deliver:
- Architecture characteristics — select at most 7 from the menu and mark exactly one as driving. Write a six-part quality scenario for every high-importance, high-difficulty leaf of the utility tree.
- Architecture style from the decision table (default: modular monolith for under 10 developers or an evolving domain). Justify with the load-bearing criteria.
- Boundaries — bounded contexts and modules, what each owns, the integration contract for each pair (context-mapping pattern), and team ownership. Never split data that must be updated transactionally.
- Data strategy — SQL vs NoSQL, consistency model, schema and migration discipline, and the idempotency contract for every mutating endpoint.
- API design — protocol, versioning, one standard error envelope, contract-first.
- Apply the cross-cutting design rules (separation of concerns, functional core / imperative shell, CQS, explicit data flow, deep modules, domain-specific naming, library-first).
- ADRs for the one-way doors — typically 3–5 decisions. Each records reversibility, decision drivers, alternatives, and its trade-off points.
Call out what NOT to build yet — premature scope is the number-one architecture mistake.
Gate 2 — proceed only when: characteristics are chosen with one driving, style, boundaries, data and API are decided, every one-way door has an ADR, and 2–3 alternatives were genuinely considered for the big ones.
Phase 3 — HARDEN: security, quality and testing baseline
Set the non-negotiable engineering standards before code exists, so they're built in.
Read references/security.md, references/quality-reliability.md and
references/testing-strategy.md (plus cross-cutting.md for accessibility, i18n, privacy and AI/LLM
features). Define up front:
- Threat model first — pick an ASVS level, draw the data-flow diagram with trust boundaries, run STRIDE per element, give every threat a disposition and an owner, and write abuse cases for the P0 stories. Then work the control checklist, including the supply-chain items.
- Code quality standards — naming, size limits, error-handling policy, review checklist, lint gates, and a fitness function for every architecture characteristic you selected.
- Feedback sensors — each rule becomes a command someone can run and a gate that blocks the merge.
- Testing strategy — run the seven test-type gates (TG0–TG6) to pick test types per component, set risk-based coverage targets by criticality, adopt TDD for logic-heavy and high-criticality parts, and write the project's four validation levels as literal commands.
- Reliability and ops — SLOs and an error-budget policy, the four golden signals, structured logging, tracing, stability patterns for every integration point, CI/CD stages, deployment strategy, and the required docs.
Gate 3 — proceed only when: the threat model is done with owners, the security checklist is reviewed against the chosen ASVS level, a testing strategy exists per component, and the CI quality gates are defined as runnable commands.
Phase 4 — PLAN: decompose into buildable work
An ordered, verifiable implementation plan.
Read references/phase-4-planning.md and references/templates.md. Deliver:
- Work ordered by risk, not by layer: M0 walking skeleton → M1 riskiest assumption → foundational blocking prerequisites → user stories as vertical slices → polish.
- INVEST stories broken into atomic tasks: one task = one session = one commit, 1–3 files, a single
testable outcome, exact paths,
[P]only where nothing is shared. - Every task carries all seven fields, including a runnable Verify command. A task nothing can prove is not a task — writing that proof is the task.
- A Definition of Done, and a technical-debt register for anything you consciously defer.
- Self-review the plan: spec coverage, placeholder scan, name and type consistency.
Gate 4 — proceed only when: every task is small, ordered, traceable to an FR-n or ADR, and carries a
Verify command.
Phase 5 — HANDOFF: make the blueprint executable
Write the artifacts to the repo so a fresh session — human or agent — can start work with no re-explanation.
Read references/phase-5-handoff.md. Deliver:
- The artifact tree under
docs/, withdocs/blueprint.mdas an index rather than a monolith. AGENTS.mdat the repo root (under about 100 lines) plus aCLAUDE.mdthat points at it.docs/plan/tasks.md— the handoff file, with the session protocol at the top.- The consistency check: every requirement maps to a task, every task cites a requirement or ADR, no task contradicts an accepted ADR, no non-goal is being built.
Gate 5 — done when: the consistency check reports no critical or high findings, and a fresh agent
session given only AGENTS.md and docs/plan/tasks.md could execute task T-001 without asking a question.
Then — and only then — start coding, ideally TDD.
Quality gate mechanics (optional, for high-stakes projects)
For important work, score each phase's output 0–5 against its checklist before advancing: pass at 3.5/5 or above; on a fail, revise and retry, at most about three times, then proceed with a logged warning. Treat a self-assigned 5.0/5.0 as a red flag — re-check. Add a human checkpoint ("Continue? [Y/n/feedback]") after any phase the user cares about.
Reference map
| File | Contents |
references/phase-1-discovery.md | Idea refinement, appetite and rabbit holes, pre-mortem, impact map, PRD structure, requirements and EARS, metrics and counter-metrics, the clarify gate, the Gate 1 checklist |
references/phase-2-architecture.md | Architecture characteristics and quality scenarios, style selection, quantum and coupling, patterns, DDD and context mapping, API and data design, idempotency, team topologies, module depth |
references/tech-selection.md | Stack decision tables, subdomain triage (core/supporting/generic), build-vs-buy, cost and effort estimation, the tech decision gate |
references/diagrams.md | C4 and Mermaid templates, including a data-flow diagram with trust boundaries — which diagram answers which question |
references/security.md | ASVS levels, threat modelling (four questions, STRIDE per element, abuse cases), OWASP Top 10 coverage map, the control checklist, supply chain |
references/quality-reliability.md | Fitness functions, feedback sensors, code-quality rules, stability patterns, SLOs and error-budget policy, percentile discipline, toil, performance, CI/CD, docs |
references/testing-strategy.md | Test-type gates TG0–TG6, the four validation levels, the TDD loop, coverage and mutation testing |
references/phase-4-planning.md | Risk-first ordering and the walking skeleton, atomic task criteria, plan self-review, YAGNI and Kaizen, technical-debt quadrant, Five Whys, tracking |
references/phase-5-handoff.md | Artifact layout, the tasks.md handoff format, AGENTS.md, the consistency check, the agent session protocol |
references/cross-cutting.md | Accessibility, i18n, privacy and GDPR, AI/LLM features mapped to the OWASP LLM Top 10, SEO |
references/templates.md | PRD, constitution, ADR, threat register, Definition of Done, task block, blueprint index, consistency report |
references/principles.md | The canon worth quoting when a decision stalls, DORA and SPACE, and a recommended reading list |
references/example-walkthrough.md | A full worked example through every phase — read this to see the skill applied |
Does it work?
Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.
No reviews yet
People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.
- It worked
- Partly
- It didn't
Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.
Your trail
Files you open will collect here, so you can find them again.
Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.
Now do this for your own.
Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.

