Refine a Deep Work Plan — safely edit scope, add, split or reorder tasks, promote a Lite plan to Full task files, recover a partial promotion, or explicitly migrate a legacy plan, always preserving completed evidence.

The file

Show its rules and text

We split this skill into the rules it gives an agent

17 rules. About 0 are common, 7 are distinctive, and 10 are very specific to this project.

  • ≈0

    Common · estimate

    Many files like this have a rule of this kind.

  • ≈7

    Distinctive · estimate

    This author's own choices. Worth a look.

  • 10

    Very specific

    Tied to their project's names, files or tools. Probably skip.

  • Common
  • Distinctive
  • Very specific
  1. Distinctive:

    No parameters → Step 1 (interactive).

    line 64
  2. Very specific:

    3.1 Select: If not specified, list plans with ../shared/plan_paths.py --plans-dir <dwp_dir>/plans list.

    line 79
  3. Very specific:

    3.2 Read and classify: Read the plan README, the task files, PROGRESS.md, and — when present — manifest.json and state.json.

    line 84
  4. Very specific:

    3.2a — v5 → v6 migration (explicit request only): When the developer asks to migrate a v5 plan to v6, route to ../shared/migrate_v6.py — …

    line 99
  5. Distinctive:

    Never overwrite unrelated artifacts.

    line 126
  6. Distinctive:

    3.4 Choose modification: Add task(s) / Edit task / Split task / Reorganize / Update README / View task details / Done.

    line 133
  7. Distinctive:

    Update README / View task details / Done.

    line 134
  8. Very specific:

    Add task(s): ask for the insert position (a number in the range above, before-final, or after {k}), gather task details, create the task …

    line 151
  9. Very specific:

    Done: run 3.6 Synchronize once more, report modifications (what was added / edited / split / reordered, which evidence was invalidated and …

    line 177
  10. Very specific:

    Never leave a README [x] for a task file that no longer exists, or a task file with no README entry.

    line 199
  11. Distinctive:

    3.7 Invalidate affected evidence (when requirements change): when an edit changes a task's acceptance criteria, scope, Touched Surface or …

    line 202
  12. Very specific:

    Reshape the ending: If none of the three legacy final tasks has started, replace them with a single {N}.task_final_review.md (content per …

    line 277
  13. Very specific:

    Declare it: Add to the README Plan Variables the line Standard: DWP spec 2.3.0 (migrated from A.B.C on YYYY-MM-DD — <reason>) and a dated …

    line 293
  14. Distinctive:

    Recovery comes before starting a new transaction: If a promotion marker already exists (including after the format switched to Full), …

    line 309
  15. Distinctive:

    If interrupted, retain the marker and identify the exact missing boundary.

    line 328
  16. Very specific:

    Preserve completed work: never alter [x] tasks unless explicitly asked.

    line 333
  17. Very specific:

    Renumber carefully: keep task file numbers, README references, dependency pointers, team-agents metadata and state.json ids in sync (3.6).

    line 335

≈ “Common” is an estimate: at least 1 in 5 of the 350,495 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.

Keep what fits and drop the rest. Your version, ready for your agents.
Files
SKILL.md

DeepWorkPlan — Refine

Modify an existing plan (add / edit / split / reorder tasks, update the README, promote a Lite plan to Full, or — only on explicit request — migrate a legacy ending or a v5 plan to v6).

No drafts (2.4.0): create materializes an executable Lite plan directly, so there is nothing to "refine into a plan" any more. refine operates on a plan folder under .dwp/plans/. The .dwp/drafts/ directory and the PLAN_{name}_draft_refined.md artifact were removed in 2.4.0.

Shared resources (read these)

  • ../shared/dwp-paths.md — plans at .dwp/plans/, plans at .dwp/plans/<plan>/.
  • ../shared/context.sh — resolve dwp_dir.
  • Guide (essential — read for this flow): ../guide/authoring.md (plan README §4, task-file anatomy §5 incl. the Touched Surface, mandatory elements) and ../guide/structure.md (§1–§2 naming and folders).
  • Guide (conditional — read only when the trigger fires): ../guide/orchestrator.md / ../guide/team-agents.md only for plans that use them; ../guide/execution.md §6.1 when editing the Final Review (or a legacy plan's final tasks). Do not read other guide files for this flow; ../guide/GUIDE.md is the routing index, consulted only when a section is not named above.
  • Shared contract (conditional — read the named steps only when the trigger fires): ../create/SKILL.md Steps 3.5–3.7 and 4.4–4.5 when promoting a Lite plan, adding or splitting a task, completing a partial materialization, or migrating — the one contract for task anatomy, gate selection, the Final Review, the ledger, the write order and the plan-quality check (refine never has a second template); ../spec/PLAN_STATE.md §5–§6 when the plan carries state.json (regeneration, evidence invalidation) or on migrate (the declared-migration line).
  • Conditional — read only when the trigger fires: ../examples/CREATE_PLAN.md — prompt patterns for professional rewriting; read it when rewriting plan-level structure or authoring new plan sections — task-level edits and promotions need only the contracts named above.

Parameter Support

ParameterDescriptionExample
(none)Interactive — choose a plan/dwp-refine
plan {plan_name}Modify an existing final plan/dwp-refine plan auth_refactor
plan latestModify the most recent plan/dwp-refine plan latest
migrate {plan_name}Explicit migration: a legacy three-task ending to the v5 Final Review shape, or a v5 plan to v6; never automatic/dwp-refine migrate auth_refactor
promote {plan_name}Promote a ready Lite plan to Full task files without changing scope/dwp-refine promote small_fix

Trust boundary (write scope)

allowed-tools includes write-capable Edit, Write, and Bash.

Writes: edits confined to the target plan's files under .dwp/plans/<plan>/ — task content, ordering, the README's task list and counts, PROGRESS.md, and the regenerated state.json — kept mutually consistent. Deleting a completed task, dropping the Final Review (or a legacy plan's final tasks), or invalidating completed evidence requires explicit developer confirmation. manifest.json is never rewritten (../spec/PLAN_STATE.md §2).

It MUST NOT: touch source files, write outside .dwp/, weaken a task's acceptance criteria or validation gate without saying so in the diff summary, change a plan's standard without an explicit migrate request, or commit/push anything (refinement output stays uncommitted working state).

Workflow

Step 2 was the draft workflow; it was removed in 2.4.0. The remaining step numbers are unchanged so existing cross-references keep resolving.

Step 0 — Determine Target Type

  • No parameters → Step 1 (interactive).
  • plan {name} / plan latest → Step 3 (Plan Workflow).
  • migrate {name} → Step 4 (Explicit Migration).
  • promote {name} → Step 5 (Lite Promotion).

Step 1 — Interactive Selection

List the plans under .dwp/plans/ and ask which one to modify (add / edit / split / reorder tasks, adjust context, promote a Lite plan). Route to Step 3, or to Step 5 when the developer asks to promote. Mention migrate only if the selected plan is legacy.

Plan Workflow

Step 3 — Select and Modify a Final Plan

3.1 Select. If not specified, list plans with ../shared/plan_paths.py --plans-dir <dwp_dir>/plans list. Resolve a full name, numeric ID, unique slug, or latest with the same helper's resolve command. latest is the highest numbered plan when one exists, or the most recently modified legacy plan.

3.2 Read and classify. Read the plan README, the task files, PROGRESS.md, and — when present — manifest.json and state.json. Establish:

  • The plan's generation. A folder carrying manifest.json with a contract pointer, contract.json, or a contracts/ chain is a v6 plan: scope, acceptance, permissions or envelope changes are contract amendments — author the revised contract (a copy of the live one, edited), then run python3 ../shared/ledger.py --plan <dir> amend --contract <draft> --authority <who> --note <reason> --human-note <file> (../spec/V6_LIFECYCLE.md §5: revision under contracts/, amendment event, fresh approval citing the new contract id, re-evidence of the revised criteria — one resumable verb, never by hand). The markdown task edits below still apply to the plan's human layer; the contract never moves through them. A v5 plan is never migrated to v6 implicitly; the one explicit path is the migration surface below (3.2a).
  • 3.2a — v5 → v6 migration (explicit request only). When the developer asks to migrate a v5 plan to v6, route to ../shared/migrate_v6.py — never rewrite records by hand: preview (integrity check + task mapping + the re-evidence list — criteria whose v5 evidence cannot carry become blocked by default until their gates re-run under v6), then migrate --authority WHO (backup → contract synthesis → manifest swap → journal import → projection; resumable at every phase), and rollback for the explicit reverse (restores the v5 bytes from the verified backup; refuses when post-migration v6 work exists unless --force). Imported gate evidence is labeled imported with the v5 source digest — never observed. The normative flow is ../spec/V6_LIFECYCLE.md §8. The reverse direction (v6 → v5) does not exist.
  • The plan's standard (../spec/PLAN_STATE.md §6.1): a declared **Standard:** line in the README wins; otherwise manifest.spec_version; otherwise (no manifest) the shape of its files. New shape = a single {N}.task_final_review.md last. Legacy shape = three final tasks (security_review → skills_agents_discovery → executive_report). Refine retains the plan's shape; only Step 4 changes it.
  • Partial materialization: a folder whose README.md is missing, says Plan Status: materializing, or links a task file that does not exist is an interrupted create. Read manifest.json and the README task list to report the intended shape against what exists; offer to complete it (regenerate only the missing files from analysis_results/PLAN_ANALYSIS.md per ../create/SKILL.md Step 4.4, leaving existing task files and the manifest intact, then flip the status line) or discard it (explicit confirmation). Never overwrite unrelated artifacts.
  • Objective, context, guidelines, tasks and their [x]/[ ] status, and any in-progress checkpoint.

3.3 Show current state — objective, standard (new / legacy), the task list with status, and the location .dwp/plans/<plan>/.

3.4 Choose modification: Add task(s) / Edit task / Split task / Reorganize / Update README / View task details / Done.

3.5 Execute modifications

Final-task protection (lifecycle-aware, applies throughout):

  • New shape: the Final Review must remain the last task. It CANNOT be deleted or reordered, but it CAN be edited (e.g. to add plan-specific review criteria). If the user tries to delete or move it, explain: "The Final Review is the mandatory final task. It can be edited but not deleted or reordered."
  • Legacy shape: Security Review stays third-to-last, Skills & Agents Discovery second-to-last, Executive Report last; same rule — editable, never deleted or reordered — unless the user runs an explicit migrate (Step 4).
  • Insert positions are therefore 1..N-1 for a new-shape plan and 1..N-3 for a legacy plan; before-final always means "immediately before the first final task of this plan's shape".
  • Add task(s): ask for the insert position (a number in the range above, before-final, or after {k}), gather task details, create the task file with the full standard structure (../create/SKILL.md Step 4.4 item 2: ten sections incl. Touched Surface, selected gates, the skills-decision checklist step, the Skills disposition: / Gate record: log lines), renumber subsequent files, and run 3.6 Synchronize.
  • Edit task: show current content; apply changes to title / instructions / acceptance criteria / Touched Surface / validation / everything. Final tasks are editable. Then run 3.7 Invalidate affected evidence and 3.6 Synchronize.
  • Split task (unfinished, oversized): split task k into two or more tasks k, k+1, … — one objective per child (../spec/DWP_SPECIFICATION.md §6.4) — such that every requirement, acceptance criterion, constraint and reference of the original lands in exactly one child — nothing is dropped or summarized. Distribute the original's Touched Surface, Read Before Starting pointers and Outputs to the child that owns them; a child that consumes another child's output names it in Read Before Starting. Carry any already-recorded evidence (a partial Completion & Log, a checkpoint, a passing gate) into the child that owns that work, verbatim, and leave a one-line pointer in the other children. A [x] task is never split without explicit confirmation (it is completed work). Renumber and run 3.6 Synchronize.
  • Reorganize: move / merge / delete. Renumber files as needed and always keep the plan's final task(s) last. Warn before deleting a completed [x] task (explicit confirmation). Merging keeps every requirement of both tasks.
  • Update README: objective / context / global guidelines / execution rules (including an explicit Executive Report request, which the Final Review honors).
  • View task details: display the full task file.
  • Done: run 3.6 Synchronize once more, report modifications (what was added / edited / split / reordered, which evidence was invalidated and why), and offer to execute/resume via the Execute (../execute/SKILL.md) or Resume (../resume/SKILL.md) sub-skill.

3.6 Synchronize (after every modification — the plan must never be left inconsistent):

  • README: task list entries, links (N.task_{title}.md), the Plan Status: X/N count, the Analysis Outputs table, and any Team Agents Configuration tables (Parallel Task Groups / roles) that name task numbers.
  • Task files: numbers in file names and titles; Read Before Starting references to renumbered tasks; Team Agents Metadata (Can Run With, Blocks); Blocks/Depends wording that names a task.
  • PROGRESS.md: the active task / next action, and a dated entry describing the refinement (what changed, what was invalidated).
  • state.json (when present): regenerate it from the markdown (../spec/PLAN_STATE.md §5) — one entry per task file, ids and files matching the disk, task_count = current number of task files, completed_count = README [x] count. Entries of completed tasks keep their completed_at, commit, gates and outcome (re-keyed if renumbered). Write atomically. manifest.json is not touched: its task_count is the count at creation; the live count is state.json.task_count.
  • Never leave a README [x] for a task file that no longer exists, or a task file with no README entry.

3.7 Invalidate affected evidence (when requirements change): when an edit changes a task's acceptance criteria, scope, Touched Surface or gate — or changes an upstream task whose outputs a completed task consumed — list the affected completed tasks and, with the user's explicit confirmation, mark them for re-validation: README checkbox back to [ ] with a (re-validate: requirements changed by refine on YYYY-MM-DD) note, state.json entry status pending with its gate records kept and their evidence prefixed invalidated by refine YYYY-MM-DD:, and an appended "Invalidated" note in the task's Completion & Log. Completed logs, commits and outcome records are never deleted or rewritten — the executor re-runs the gates and re-marks the task (../spec/PLAN_STATE.md §5.1). Without confirmation, record the concern in PROGRESS.md and change nothing.

Amendment record (append to the affected task's Completion & Log, and mirror the entry in PROGRESS.md): every scope, criterion or deferral change leaves one durable record with these fields — no field is optional padding, and an amendment is never backdated:

### Amendment {n} — YYYY-MM-DD
Original criterion: <verbatim quote of the criterion as authored>
Observed: <investigation finding, blocker, failed gate or changed input>
Disposition: revised criterion | deferred requirement | unexecuted scenario | failed gate
Revised criterion: <verbatim new criterion — only for "revised criterion">
Reason: <why the original cannot or should not stand>
Authority: user (explicit acceptance) | developer (refine request) | evidence (machine-detected mismatch)
Affected tasks: <ids>
Evidence invalidated: <gate commands per task, prefixed by refine>
Evidence preserved: <gate commands whose inputs are unchanged>

What an amendment may close and what it may not. Name the state honestly (the five evidence states, ../spec/PLAN_STATE.md "Evidence truth and amendments"): a completed investigation is real work but is never the execution of the original criterion; an unexecuted scenario is recorded as not performed and contributes no passing evidence; a deferred requirement moves the criterion to a named destination task and needs Authority: user or developer; a failed gate stays failing until the same acceptance intent is re-run and passes; only an achieved product outcome — the criterion as written, verified by its gate — completes the task unchanged. Correcting a broken command preserves the same acceptance intent; substituting an easier check is not repair, it is a revised criterion and needs its own amendment.

Bounded exceptions. The user may explicitly accept a bounded exception to a criterion; record Authority: user with the acceptance (quote or reference) and the boundary of what it covers. Pre-approval and trust authorize unattended execution — they are never blanket permission to abandon a core objective. A mandatory criterion that cannot be met is recorded as a blocker (state.json blocked), never as completed work; the guarded writer refuses that closure and read-only verification reports it.

Explicit Migration

Step 4 — Migrate a Legacy Plan (only on migrate {name})

Migration is the only way a plan changes standard, and it happens only when the developer asks for it explicitly (../spec/DWP_SPECIFICATION.md §6.5, ../spec/PLAN_STATE.md §6.1). Never suggest it as a side effect of another edit.

Route by recorded generation before Step 4.1. For a v5 plan, use the v5 → v6 migration path in Step 3.2a and ../spec/V6_LIFECYCLE.md §8: run python3 ../shared/migrate_v6.py --plan <dir> preview, inspect the re-evidence list and blockers, then run python3 ../shared/migrate_v6.py --plan <dir> --authority <who> migrate on the explicit request. Report the migrated contract, journal, projection, and criteria requiring new evidence. Do not apply Steps 4.1–4.6 below to a v5 plan. Those steps only migrate a pre-v5 three-task ending to the retained v5 Final Review shape. A v6 plan already uses the current generation and has no migration step.

  1. Classify (Step 3.2). If the plan already has the v5 Final Review shape, say so and stop.
  2. Preserve completed work. Any [x] task — including a legacy final task that has already run — is left exactly as it is. Only unstarted tasks may take the new shape.
  3. Reshape the ending. If none of the three legacy final tasks has started, replace them with a single {N}.task_final_review.md (content per ../create/SKILL.md Step 4.4 item 3, incl. the security pass, final-state validation, skills reconciliation, documentation reconciliation, completion and report offer). If the Security Review already ran, keep it and replace only the two unstarted closing tasks with the Final Review's remaining parts (b)–(e); the Final Review security pass (a) still runs the required local review over the accumulated change set. Record the decision in PROGRESS.md.
  4. Add the new-shape elements to unstarted tasks and to the plan: a Touched Surface (planned surface, risk class, selected gate — derived from docs/TESTING_GUIDE.md, or the full-suite fallback where the repository documents no scoped invocation) on every unstarted behavior-changing task; the skills-decision checklist step and the Skills disposition: / Gate record: log lines; analysis_results/SKILLS_CANDIDATES.md; the Analysis Outputs table rows; the Final Review note in the README.
  5. Declare it. Add to the README Plan Variables the line **Standard:** DWP spec 2.3.0 (migrated from A.B.C on YYYY-MM-DD — <reason>) and a dated entry in PROGRESS.md. Leave manifest.json untouched (creation provenance).
  6. Synchronize (Step 3.6) and report: what was reshaped, what was preserved, what the executor will do differently from here.

Step 5 — Lite Promotion

Promotion changes only task representation. Read spec/LITE_PLANS.md, the Lite README decision record and v2 state first. An explicit promotion request approves the current proposal's representation change; record Approval: approved before starting. It does not authorize product execution or a scope change. Refuse an active task, an unresolved product-work blocker, or an unknown format. A scope/requirement change is refine, not promotion.

Recovery comes before starting a new transaction. If a promotion marker already exists (including after the format switched to Full), resume that same transaction from its recorded phase. Verify the existing destination files against the source records and evidence; write only missing files, preserve user edits, and never overwrite conflicting evidence. A conflict becomes an actionable blocker. Do not reject the marker that execute/resume sent here to recover, and do not create a second promotion transaction.

  1. Record promotion: lite → full intent atomically in state and README.
  2. Generate Full task files for unchanged logical task IDs, preserving criteria, gates, logs, completion status and lineage. Promotion never splits tasks or grants invented evidence. Split or add work separately through refine, with the affected approval and evidence invalidated before promotion resumes.
  3. Validate contiguous IDs, links, gates, final review and Markdown/state correspondence before switching the README's authoritative task representation.
  4. Rewrite the state projection atomically with format: full, then clear the promotion marker last. Preserve manifest creation provenance and never rewrite it to disguise a changed live task count.

If interrupted, retain the marker and identify the exact missing boundary; complete only missing files and preserve user edits. Execute/resume must not run a marked plan. Full-to-Lite downgrade is not automatic.

Important Notes

  • Preserve completed work: never alter [x] tasks unless explicitly asked; invalidation (3.7) marks them for re-validation, it does not rewrite them.
  • Renumber carefully: keep task file numbers, README references, dependency pointers, team-agents metadata and state.json ids in sync (3.6).
  • Maintain consistency: task files follow the standard structure (../guide/authoring.md §5; the shared contract in ../create/SKILL.md).
  • One shape per plan: refine keeps the plan's standard; migrate is the only exception and is explicit.
  • No mandatory report: refine never adds an Executive Report task; it may record an explicit report request in the README guidelines.
  • Git ignore: everything under .dwp/ is git-ignored.
  • No draft artifact: refine always operates on a plan folder under .dwp/plans/. Nothing is written to .dwp/drafts/ — it no longer exists.

Error Handling

  • Plan not found → list available plans and let the user select.
  • Partial materialization (no README.md, Plan Status: materializing, or a dangling task link) → offer complete / discard (3.2).
  • Task number out of range → show the valid range for this plan's shape and re-ask.
  • Deleting or splitting a completed [x] task → confirm explicitly first.
  • Plan has work in progress (a checkpoint or an in_progress task) → warn about impact; suggest finishing the current task first; never edit the in-progress task's evidence.
  • migrate on a plan already in the requested generation and shape → report and stop.

Download now (ZIP)

Does it work?

Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.

No reviews yet

People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.

  • It worked
  • Partly
  • It didn't
What did you use it for? e.g. Reviewing pull requests in a Rails app

Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.

Your trail

Files you open will collect here, so you can find them again.

Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.

Now do this for your own.

Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.