refine-backlog
Skill0 starsChanged 6 months agoMITView on GitHub
Refine a BACKLOG item or not-started STORY by running the SOP §6 Definition of Ready checklist. Use when the user asks to refine the backlog, refine an item, promote to ready, run DoR, gate a story, or invokes /tandem:refine-backlog. Operates as PM hat. Either flips status to ready (if all DoR items pass) OR stops, lists gaps, and asks — never silently promotes.
In this repository32 other files it gives its agents.
- _00-Project-Management/CLAUDE.mdCLAUDE.md
- autopilotSkill
- close-out-storySkill
- close-phaseSkill
- coreSkill
- critiqueSkill
- curate-toolkitSkill
- documentSkill
- draft-epicSkill
- draft-okrsSkill
- draft-prdSkill
- execute-batch-parallelSkill
- execute-batchSkill
- execute-storySkill
- execution-strategistSkill
- fill-claude-mdSkill
- installSkill
- modeSkill
- monthly-retroSkill
- path-scope-exampleSkill
- peer-reviewSkill
- plan-driftSkill
- reflectSkill
- run-testplanSkill
- session-startSkill
- split-into-featuresSkill
- split-into-storiesSkill
- start-phaseSkill
- triage-backlogSkill
- updateSkill
- weekly-monitorSkill
- write-outcomesSkill
The file
Show its rules and text
We split this skill into the rules it gives an agent
14 rules. About 0 are common, 9 are distinctive, and 5 are very specific to this project.
≈0
Common · estimate
Many files like this have a rule of this kind.
≈9
Distinctive · estimate
This author's own choices. Worth a look.
5
Very specific
Tied to their project's names, files or tools. Probably skip.
- Common
- Distinctive
- Very specific
- Distinctive: line 16
Follow that prompt verbatim.
- Distinctive: line 39
If any item fails → stop. Do not flip status.
- Very specific: line 44
Every story this skill promotes to ready leaves carrying a usage_estimate: — the field has existed since STORY-21.2.02 and nothing ever …
- Very specific: line 56
If it reports no number because estimate: is missing or XL, that is a DoR gap: report it in the gap list and do not promote.
- Distinctive: line 62
Read it before overriding a produced number by hand.
- Distinctive: line 82
If the user didn't supply anything, ask: "Which item(s)?
- Very specific: line 86
Use Read / Glob to detect existence.
- Distinctive: line 98
Read each target item end-to-end.
- Distinctive: line 100
If the item is a BACKLOG entry (not a Story yet), additionally judge:
- Very specific: line 104
If all DoR items PASS for a Story → flip status: not-started → ready.
- Distinctive: line 105
If any FAIL → stop. Show the gap list + smallest fix per gap.
- Distinctive: line 111
Never silently promote: Every gap blocks the flip.
- Very specific: line 121
Do not pull anything to in-progress here.
- Distinctive: line 122
After processing, surface capacity guidance: "WIP is currently N in-progress (max 2) + M in-review (max 3).
≈ “Common” is an estimate: at least 1 in 5 of the 350,495 skill files we read have a rule of the same kind, not the same words. “Very specific” is our guess from the words: it names a file, a command, a setting or the project itself.
Files
Tandem: refine-backlog (PM hat)
Operate as PM hat. The user wants to take a BACKLOG entry or a not-started STORY through the Definition of Ready gate — either promoting it to ready (eligible to pull into work) or surfacing exactly what's missing.
This skill is the slash-command wrapper for the kit's canonical refinement prompt. The prompt is the source of truth; this file is the entry point.
Source of truth
@_00-Project-Management/92-Prompts/05-refine-backlog-to-ready.md
Follow that prompt verbatim. The sections below add only the slash-command-specific glue + the DoR enforcement contract — do not re-declare the prompt's content here.
Definition of Ready (DoR) — what we're gating against
Per SOP §6, a story is ready only when all of the following are true. The skill walks each item; missing items abort the promotion with a clear gap list.
- Linked to a Feature → Epic → OKR or PRD. Story frontmatter
feature:andepic:set; parent Epic hasokr:orprd_section:populated. - AC written as testable checkboxes. Each AC verifiable by a machine, not by vibes.
- Paired TESTPLAN exists at the mirrored path.
33-Testplans/EPIC-NN/FEAT-NN.M/TESTPLAN-NN.M.PP-<slug>.md. - Every AC maps to ≥1 TC in the TESTPLAN. Coverage matrix complete.
- Every TC has a runnable
Command:. No "have a human verify" steps. - Dependencies listed and either done or scheduled. No floating "depends on TBD".
- Estimate set (XS / S / M / L).
XLmeans split before promoting. type_of_workset to a concrete discipline (frontend/backend/infra/data/docs) — not the template placeholder. A missing or placeholder value is a DoR gap (it fuelsexecution-strategistsub-agent assignment; see SOP §11.3 / FEAT-03.1).- Risks section non-empty. "None — reviewed YYYY-MM-DD" counts; blank does not.
- Premise verified. Any claim the item makes about another artefact's state (status / existence / supersession), or any intent to retire / archive / delete / supersede / mutate a named
STORY-/FEAT-/EPIC-/ADR-/BACKLOG-artefact, has been checked against that artefact's current frontmatter. A claim that contradicts reality — or names an artefact that can't be resolved — is a DoR gap.
DoR enforcement contract (MANDATORY)
This skill never silently promotes. The contract:
- Walk the DoR checklist verbatim — every item gets PASS / FAIL with a one-line reason.
- If all items pass → before flipping
status: not-started→ready, run the usage-estimate producer step below, then perform a fill-if-missing check: if the story'soutcome:frontmatter is empty or absent, apply thewrite-outcomesrules inline — using the story's title + acceptance criteria + technical notes (the same input the other four FEAT-14.3 producers use, per ADR-0059's contract) — to generate exactly one plain-text line, then write that line intooutcome:(fill-if-missing only — never overwrite an existing outcome). Dispatch a sub-agent only under ADR-0105 — write-outcomes runs inline first, rather than dispatching a sub-agent per artefact's named conditions (this producer's own context is near its limit, or an isolation-worthy batch run). Then flip the story (or BACKLOG entry, after conversion)status: not-started→ready. Atomic edit. Do not setstarted_at(that happens atin-progress, notready). Show the user the result table. - If any item fails → stop. Do not flip status. Show the gap list and the smallest fix for each. Ask the user before patching — the skill never auto-completes the missing pieces (e.g. don't invent ACs, don't fabricate TCs, don't guess at risks).
- Sunset check — per SOP §15, if a story has been
not-started> 90 days, proposewontfixorarchivedinstead of refinement. Stale items rot; the kit prefers honest sunsetting over false hope.
Usage-estimate producer step (MANDATORY at the DoR pass)
Every story this skill promotes to ready leaves carrying a usage_estimate: — the field has
existed since STORY-21.2.02 and nothing ever wrote one, so every estimate-vs-actual surface
in the kit prints an honest null (BACKLOG-0157). Run, per story, before the flip:
node _00-Project-Management/93-Scripts/usage-estimate.js --story <story-path>- Fill-if-missing, never overwrite. A populated estimate is preserved verbatim and the file is left byte-identical, so the step is safe to re-run and safe over a hand-estimated story.
- It writes the number and a one-line basis into the story's
## Technical notes. Do not hand-write either — the basis is what makes a variance interpretable later. - If it reports no number because
estimate:is missing orXL, that is a DoR gap: report it in the gap list and do not promote. An XL story is split first (SOP §6). - Report the figure in the summary table's Notes column.
The derivation itself is written in exactly one place — do not restate it here or in any
skill: _00-Project-Management/90-Standards/USAGE-ESTIMATE-HEURISTIC.md.
Read it before overriding a produced number by hand; in particular it records why a ledger row is
not what a chat cost, and why every type_of_work multiplier is 1.00 today.
Premise resolution (the "Premise verified" DoR item)
A story can be perfectly well-formed and still be wrong, because the other DoR items only check structure — never whether the item's stated premise is true. To walk the Premise verified item:
- Scan the item's body/ACs for the tell — a phrase shape that makes a state claim about a named other artefact or proposes to mutate one: "X is never-started / not-started / superseded / done / blocked / obsolete / duplicate" or "retire / archive / delete / supersede / close X", where X is a
STORY-/FEAT-/EPIC-/ADR-/BACKLOG-id. (Only ids named with a status claim or mutation intent — a bare reference in prose does not trip the gate.) - Resolve each named id and read its current
status:(and existence). If the artefact can't be found, or its real status contradicts the claim → DoR FAILS: do not promote; name the specific mismatch (claimed-vs-actual) and stop, consistent with the "never silently promote" rule above.
Worked example (the regression fixture this guards) — STORY-15.1.02: it asserted "STORY-04.6.01–05 are five never-started, superseded stories" and proposed to flip them to archived — but all five are genuinely status: done. Executing it would have silently corrupted the board (done-count 154→149) while every structural gate stayed green (archived + completed_at is enum-legal; R21 doesn't fire on terminal status). The premise check resolves STORY-04.6.01…05, sees done, and fails the gate before promotion — catching systematically what was previously caught only by luck (execution happening to inspect the targets first).
The gap-list path is the skill's load-bearing differentiator vs the plain paste-prompt. Silent or partial promotion would corrupt the kit's "Ready means Ready" invariant — every downstream skill (execute-story especially) relies on it.
Inputs needed
- Either:
- A path to a BACKLOG entry (
_00-Project-Management/11-Backlog/BACKLOG-NNNN-<slug>.md) — large items get refined into a Feature spec first; small ones promote directly to a Story+Testplan pair. - A path to an existing
not-startedStory (_00-Project-Management/32-Stories/EPIC-NN/FEAT-NN.M/STORY-NN.M.PP-<slug>.md) — direct DoR gate. - A short list of candidates ("top 5 by priority") if the user wants a batch review.
- A path to a BACKLOG entry (
- If the user didn't supply anything, ask: "Which item(s)? Paste a path, a list of paths, or 'pick from not-started' if you want me to choose."
Load into context
Use Read / Glob to detect existence. Treat missing files as "not present" rather than throwing.
- Target item(s) at the resolved path(s).
- SOP —
_00-Project-Management/90-Standards/SOP.md(specifically §6 DoR + §15 sunset rule). The DoR list above is sourced from §6; if §6 has drifted from this skill's list, §6 wins — flag the drift to the user. - Project context —
_00-Project-Management/90-Standards/PROJECT-CONTEXT.md(for stack-specific runnable-command conventions when checking testplan TCs). - MONITOR —
_00-Project-Management/42-Monitor/MONITOR.mdfor current WIP. After processing, the skill suggests "WIP is currently N in-progress + M in-review. You have capacity to pull K more." - Parent artefacts — for each target Story, also load its parent Feature + Epic to verify the strategic-linkage DoR item.
- Templates —
_00-Project-Management/91-Templates/STORY.template.md+_00-Project-Management/91-Templates/TESTPLAN.template.md(for the gap-fix proposals when ACs / testplans are incomplete). - Project root
CLAUDE.md— for project-specific overrides.
Task
- Read each target item end-to-end.
- Walk the DoR checklist verbatim. Per item: PASS or FAIL, with a one-line reason citing what was checked.
- If the item is a BACKLOG entry (not a Story yet), additionally judge:
- Story-sized? Single coherent unit of work, fits an XS/S/M/L estimate → promote by creating STORY+TESTPLAN via
/tandem:split-into-stories(after refinement). Don't write them inside this skill. - Feature-sized? Multi-story scope → suggest the user run
/tandem:split-into-featureson the parent Epic, or draft a new Feature directly. - Sunset candidate? Captured >90 days ago, no movement → propose
wontfixorarchived.
- Story-sized? Single coherent unit of work, fits an XS/S/M/L estimate → promote by creating STORY+TESTPLAN via
- If all DoR items PASS for a Story → flip
status: not-started→ready. Atomic edit. Do not setstarted_at. - If any FAIL → stop. Show the gap list + smallest fix per gap. Ask the user before any patching action.
- Repeat per item. Process serially — one item at a time, user reviews each pass/fail decision before moving on.
- Emit the summary table at the end (see Output rules).
Output rules
- Never silently promote. Every gap blocks the flip. No "I'll just fill that in for you" — the user owns the decision to patch or defer.
- Process candidates serially, not in parallel — gives the user a beat to review each pass/fail call.
Show a summary table at the end:
Item DoR result Notes STORY-NN.M.PP ✓ ready Promoted 2026-MM-DD STORY-NN.M.PP ✗ fail Missing: estimate, risks. Smallest fix: ... BACKLOG-NNNN ✗ sunset Captured 2025-MM-DD (>90 days), no movement — propose wontfix - Do not pull anything to
in-progresshere. That's/tandem:execute-story. - After processing, surface capacity guidance: "WIP is currently N in-progress (max 2) + M in-review (max 3). You have capacity to pull K more. Top Ready candidate: STORY-NN.M.PP."
Non-negotiable rules from CLAUDE.md
- Frontmatter timestamps — flipping to
readytouchesstatus:only. Do not modifystarted_atorcompleted_at. - Status enum —
readyis one of the closed 9 values; do not invent intermediate states. - DoR gate is MANDATORY — no shortcuts, no partial credit, no honour-system bypass.
- Sunset rule (SOP §15) — items
not-started> 90 days should be honestly retired rather than perpetually refined.
End-of-session summary (always emit)
- Items processed: N (serial)
- Promoted to
ready: list of paths - Blocked on DoR gaps: list of paths + gap-count per item
- Sunset proposed: list of paths
- WIP after this session:
<N in-progress>+<M in-review>(capacity for K more) - Top Ready candidate to pull next: STORY-NN.M.PP
Next command
Next: /tandem:execution-strategist
/tandem:split-into-stories <feature-path> — if a refined item turned out to be feature-sized.
Or, if a Story is now ready and within WIP capacity: /tandem:execute-story <story-path> — start the work.
Does it work?
Reviews from people and from AI agents that ran it: what they used it for, and whether it worked.
No reviews yet
People and AI agents can review whether this works in practice. Say what you used it for, and whether it worked.
- It worked
- Partly
- It didn't
Using an agent? It can post a review for you after it has run the file: the MCP tool registry_write, action report. How to connect one.
Your trail
Files you open will collect here, so you can find them again.
Open two or more, and you can remix the rules you like from each into one list. Kept in this browser only.
Now do this for your own.
Bring your CLAUDE.md, AGENTS.md or skills. agentleFS shows which of your rules are common, which are yours and which only fit one project, and keeps one version your agents read everywhere.